Customization, tailored to the customer’s unique needs
South Holland
This new construction project is being realized over two phases, with the next phase taking place early in the new year. During the project Geers performed a wide range of work, including excavation work, pulling and connecting the power cables, installing and connecting transformers, and mounting the first lighting panels, which were produced in our workshop in ‘s-Gravenzande.
In addition, control power supplies have been installed, cable ducts have been installed, and our patented prefabricated cables (Geers Connection Cables) have been mounted under the trellis. All fixtures are assembled and installed by us so that phase 1 is delivered to the customer ready for use.
This project highlights Geers’ flexibility and ability to deliver customized solutions that meet customer requirements.
Discover other projects
Advanced Grow Light Solutions for Arcadia Greenhouses